Skip to content

Wilk Strategy · tools

Forecast Reality Check

The demand was not what the plan was told to expect: volume, mix, or handle time arrived different. The miss was born before the first schedule was cut, and no amount of day-of heroics was going to close it.

The numbers here are simulated. Move them.

09:00–13:00 · 30-minute intervals

Workload (hours) = Contacts × Handle time (seconds) ÷ 3,600

ForecastActualWorkload · hours
Forecast and actual workload by interval Forecast and actual workload are shown beside each other for each matched interval. Missing intervals have no bars.
View chart data as a table

Inputs

Blank = missing · 0 = zero · Totals: matched intervals only